Stablecoin distribution

Last-mile distribution layer for stablecoins.

Inflection turns cash-heavy merchants into verified USD liquidity hubs — so people can hold, pay, send, and cash out USDC without being locked to geography.

Launch product

No POS replacement · Local cash in · USDC out

The gap

Merchants sit on cash. Communities next door need dollars.

Stablecoins already exist. The missing layer is distribution — trusted, offline, last-mile places where local cash and digital dollars actually meet.

01 Demand

USD, everywhere

People across emerging markets want dollars to save, send, and spend. Geography is still the gate.

02 Supply

Cash-heavy shops

Everyday merchants already move physical cash. They are the trusted node. They do not want a new POS.

03 Unlock

An interface, not hardware

Inflection sits on top of what they already run — swap, pay, send, cash out — and the shop keeps its stack.

Merchant flywheel

The node stays if the node earns.

Distribution only works when the last mile is paid. Inflection makes the merchant the beneficiary of the rail, not just the venue.

Forex spread on every swapNEW LINE
Footfall from people who came to move dollarsTRAFFIC
Same desk → tokenized stocksNEO-BROKERAGE
Existing POS staysZERO RIP
Why now

The world wants USD, stocks, and tokenized assets.

Issuance is no longer the bottleneck. Access is. Inflection puts people at the front of that flow so they can transact without a passport as the payment method.

Last mileVerified merchant hubs instead of correspondent banks.
Same counterSwap, pay, send, cash out — one trusted place.
On-chain dollarsUSDC in. Local cash when they need it back.